Toowoomba Second Range Crossing
Toowoomba Second Range Crossing
Toowoomba Bypass
PROJECT OVERVIEW
Engaged by Nexus Delivery, MinStaff Survey provided survey support and specialised services to various aspects of the $1.8b Toowoomba Bypass.
SCOPE OF WORKS
- Establishment of a Survey Control Network along the alignment
- Capture Aerial Photography data over the specified road network
- Resample Point Cloud generation to desired Level used to produce Digital Elevation Model
- The provision of multiple survey crews to complete Setout & As-Built Surveys for earthworks, structures and pavements throughout the Eastern, Western and Central Sections of the project
- All Cadastral Lease Surveys for 41km of toll road