Coomera Connector (Stage 1 South)

Coomera Connector

Smith St Motorway to Nerang broadbeach road
PROJECT OVERVIEW

Engaged by GHD as the Audit Surveyor on the Coomera Connector (Stage 1 South) in August 2024 to provide QA Surveying Services for the client – verifying the accuracy and methodology of the main contractor throughout the construction program.

SCOPE OF WORKS
  • Review and audit site survey control
  • Review and audit DTM
  • Field audits for embankment setout, bridge construction and settlement plates
  • Interrogation of the digital terrain model and the 12D civil design model
  • Calculation of earthwork quantities 
  • Joint surveys with the contractor’s surveyor