Cooby Dam

Cooby Dam

Highfields, QLD
PROJECT OVERVIEW

MinStaff Survey  was been engaged by Newlands Group to provide as-constructed verification of the existing Cooby Dam intake pipework as a part of the Cooby Dam Pipework Upgrade Package. 

SCOPE OF WORKS
  • Densification of the survey control network
  • High Definition (HD) Laser Scanning utilising our X7 and SX12 to produce an as-constructed pointcloud of the existing pipework, flanges, valves, penetrations and plinth locations throughout the intake tower to the pump house.
  • Generation of a 3D model of the existing structure
Cooby Dam Pipework Upgrade Toowoomba