PROJECT OVERVIEW
MinStaff Survey was been engaged by Newlands Group to provide as-constructed verification of the existing Cooby Dam intake pipework as a part of the Cooby Dam Pipework Upgrade Package.
SCOPE OF WORKS
- Densification of the survey control network
- High Definition (HD) Laser Scanning utilising our X7 and SX12 to produce an as-constructed pointcloud of the existing pipework, flanges, valves, penetrations and plinth locations throughout the intake tower to the pump house.
- Generation of a 3D model of the existing structure