Centenary Bridge Upgrade

Centenary Bridge Upgrade

Brisbane, QLD
PROJECT OVERVIEW

BMD/Georgiou awarded MinStaff Survey with the survey works package for the 40 month, $300m Centenary Bridge Upgrade Project. This project is 15km from the Brisbane CBD and involves the construction of a new three lane bridge, the remediation and refurbishment of the existing bridge and associated approach road works.

SCOPE OF WORKS
  • PUP Pickup and Relocation
  • Cadastral surveys to identify and mark the extent of the road corridor
  • Control Network Establishment
  • Bathymetric survey of the river bed to capture water depth and confirm the location and sub-water features of the substructure
  • Setout and as-built surveys for earthworks, civils and road construction
  • Setout and as-built surveys for all structures including marine piling
  • Setout and conformance surveys  for pavements and asphalting
  • Management and reporting of survey data including BIM to comply with TMR & BCC requirements
Centenary Bridge Upgrade Project